Funny story. One of my colleagues is on a long vacation, leaving my team of slaves short one. Naturally, when a team’s ranks are reduced, it’s to be expected that the remaining members pick up the slack to some capacity, which is fine and all, since that’s how a team operates. Needless to say, my workload has grown a little bit on my co-worker’s absence, but I’m alright with that, because the same can be said about the other members of my team.
However, it’s the circumstances in which my workload’s increase has come about that has me a little perplexed, which is a nicely-worded way of saying “I do not agree with the way things are, and I shake my head when I think about it.”
Basically, a number of people I work with have been tasked with removing time stamps from well over 800 JPEGs. Be it through using the clone stamp, healing brush, liquefy tool; whatever it takes to make sure that these images no longer have time stamps on them. Subsequently, while they are off in Photoshop lala-land, I am the one who is getting the brunt of the actual, meaningful work overflow. I’m confident enough to say that I’m probably the most qualified to be doing the work that matters, but my current workload is looking pretty gargantuan at the moment, which doesn’t exactly make me feel peace of mind.